hammer, tool, construction, carpenter, tools, contractor, equipment, wood, build, diy, nails, carpentry, nail, toolbox, work, repair, brown tools, hammer, hammer, diy, toolbox, toolbox, toolbox, toolbox, toolbox. Deck and patio business licenses: who holds each one
Photo by JameHans on Pixabay

Guides

Deck and patio business licenses: who holds each one

Deck and patio business licenses sort by holder: the company, the qualifier, the workers and the single job. See what proof each one asks for.

What to take away

  • Four credentials sit at business levelthe registered entity with its EIN, the local business license, the contractor license and the insurance certificates. The contractor license may cover the company, an individual qualifier or both. A building permit belongs to one job.
  • Register the entity with a state Secretary of State, get an Employer Identification Number from the IRS, then add a city or county business license.
  • Ask whether the contractor license covers the company, an individual qualifier or both. A license held personally may not protect a corporation.
  • Carry general liability of $1,000,000 per occurrence and workers' compensation before the license is issued or renewed, and confirm the limit your licensing body sets.
  • Pre-1978 housing adds U.S. EPA Lead-Safe firm certification.
  • Keep one calendar for renewals, permit closeouts and training dates, with a named owner for each.

General information, not legal, tax, insurance, engineering or code advice. Licensing, permit and coverage requirements vary by province, state and municipality, so confirm current requirements with your licensing body, your municipal permit office and qualified professionals.

Which credential belongs to whom

Each credential has a different holder, and a homeowner, a permit clerk and an insurer each ask for different proof. Sort the list by holder before you apply for anything, because a credential issued to the wrong party protects the wrong party.

CredentialHeld byIssued byWhere it gets asked forRenewal
Entity registration and EINThe companyState Secretary of State, IRSContracts, invoices and tax filingsAnnual report or as filed; EIN permanent
Local business licenseThe company at one addressCity or countyThe permit clerk usually checks it firstAnnual
Contractor licenseThe company or the qualifierState board or provincial regulatorThe license number on the permit applicationUsually annual
Liability insuranceThe companyBrokerCertificate before the homeowner signsAnnual
Workers' coverageThe workersState board, WSIB or WorkSafeBCCoverage through the boardAnnual reporting
Building permitOne job at one addressMunicipal building departmentInspections at set stagesCloses at final inspection
EPA Lead-Safe firm certificationThe firmU.S. EPAWork on pre-1978 housingFive years

The company on paper: entity, name and EIN

Register the entity before anything else, because nothing can be issued in the company's name until that filing exists. A sole proprietorship, partnership or corporation is filed with the state Secretary of State, which returns the number your invoices, contracts and tax filings run on.

If you trade under a name that is not your own legal name, the trade name registration is separate. California handles fictitious business names at the county level, and most states take them at the state or county level.

Then get an EIN directly from the IRS in minutes for free. Cities and counties add a local business license on top, and the permit clerk usually checks that one first. The startup steps cover the choice between entity types.

Company license or personal license

A contractor license is what lets the business take on construction work for a homeowner. Some jurisdictions license the company, some license the individual qualifier, and some do both. Ask which one your license covers before you sign anything in the company's name.

The difference shows up at the worst moment. A license held personally may not protect a corporation that signs the contract, and a homeowner can check the license before signing, so it has to be current and in the right name.

Bonds come with the license. California issues its license through the Contractors State License Board, and its contractor bond has been $25,000 since January 2023. Bonds in most states land between $10,000 and $30,000, so ask your own board for the figure that applies.

Put these questions to the licensing body before you apply:

  • Does the license cover the company, the individual qualifier, or both?
  • Must insurance be in force before the license is issued?
  • What bond amount applies, and when does it renew?
  • Which license number does the permit office expect on the application?
  • How often does the license renew, and who receives the notice?

Coverage and bond: the certificates homeowners ask for

General liability insurance and workers' compensation coverage are usually conditions of holding a contractor license, and homeowners ask for certificates before signing. Most licensing bodies ask for $500,000 to $1,000,000 per occurrence, and $1,000,000 is the figure homeowners request.

Workers' compensation is mandatory in every state except Texas, where most private employers can opt out while public projects still require it. In Canada, coverage runs through the provincial board such as WSIB in Ontario or WorkSafeBC in British Columbia.

Confirm the limits your licensing body requires rather than choosing a number by feel. Ask your broker what the current minimum is, and see what insurance costs and coverage look like for a deck and patio business. The license usually requires insurance in force, so check the certificate before every renewal.

The permit is the credential that is not yours

A building permit is issued for a specific deck or patio at a specific address. It is not a company credential and it does not carry from one job to the next. The permit office asks for the contractor license number on the application.

The municipal building department reviews the drawings, then inspects the work at set stages. Typical hold points are footings before the pour, framing before decking goes down, and final inspection at completion. A permit inspection checklist for your city shows what inspectors look at at each stage.

Fees typically run $100 to $500 for a residential deck, and cities that charge by project valuation often land higher. Chicago commonly asks for a plat of survey with a permit application, so ask what your own office needs before you file.

Building out of order is the expensive mistake. A crew that frames a deck before the permit is issued can be ordered to stop, and the fix is often demolition, not paperwork. Regulators outside the building department are mapped in the licensing and compliance guide.

Lead-Safe certification for older homes

Pre-1978 housing adds one more credential. In general, anyone paid to perform work that disturbs paint in housing built before 1978 must be certified in lead-safe work practices, and that includes all firms, even sole proprietorships.

The certification lasts five years, and that renewal date is easy to lose. Put it on the same calendar as the license, the insurance certificate and the permit closeouts, so a lapse is caught before a job depends on it.

Subcontractors bring their own

Subcontractors need their own license and coverage, and you need the certificate before they start. Assuming the owner's credential covers the whole operation is the common error. Ask for the certificate and the license number in writing, and file both with the job the way you file your own.

Inside the company, each credential also needs a person. The estimator quotes from the licensed entity. The designer works to the code the permit office applies. The crew lead carries the training records for the tasks on site. The project manager tracks permit hold points.

One calendar, one owner per item

File the license, the insurance certificate, each permit and its inspection sign-offs, and every change order as the job moves. Records assembled after a complaint look assembled after a complaint. A change order form keeps the scope changes on paper.

One calendar, one owner per item. Renewal dates, permit closeouts and training expiries all live in the same place. Check it monthly, because a license that lapses stops the business from contracting.

Records to keep retrievable

  • Licenses
  • Training
  • Inspections
  • Agreements
  • Maintenance
  • Incidents
  • Taxes
  • Insurance notices

Project record retrieval checkpoints

  1. Lead
    retrieve license and insurance
  2. Site visit
    retrieve measurement and design handoff
  3. Estimate
    retrieve pricing and scope records
  4. Contract
    retrieve signed agreement and permits
  5. Procurement
    retrieve purchase and delivery records
  6. Mobilization
    retrieve crew and equipment assignments
  7. Demolition
    retrieve disposal and safety records
  8. Inspection
    retrieve approval and correction records

When a credential slips

Credentials fail in a few predictable ways, and each one traces back to a holder assumed rather than checked.

  • Framing before the permit is issuedthe building department can order the work stopped, and the remedy is often to open the structure for inspection or remove it.
  • Holding the license personally while the corporation signs contracts: the license may not protect the company.
  • Letting insurance lapsethe license usually requires insurance in force, so check the certificate before every renewal.
  • Assuming the owner's credential covers a subcontractorit does not.
  • Losing the five-year Lead-Safe renewal date, which is easy to do.

Common questions

Do I need a license before I can pull a permit?

In most jurisdictions, yes. The permit office asks for the contractor license number on the application, and the license usually requires insurance to be in force. California, Arizona and Florida all tie the two together. Confirm the sequence with your licensing body and permit office, because the order can differ.

Is a building permit the same as a contractor license?

No. The license lets the company contract for work. The permit authorizes one deck or patio at one address, and it closes when the final inspection passes.

What happens if I build before the permit is issued?

The building department can order the work stopped, and the remedy is often to open the structure for inspection or remove it. The cost lands on the contractor, not the homeowner.

How often do these renew?

Business registration and licenses typically renew annually, insurance annually, and permits close per project. EPA Lead-Safe firm certification runs five years. Put every date on one calendar with a named owner and check it monthly.

More in Guides

Latest from Planning Desk